Within a tight time-frame our team designed, engineered, manufactured, delivered & installed the Span+ system.
Completed in March 2021, Wagga Wagga NSW.
This rafter-mounted HVAC mechanical plant deck was retrofitted to a section of roof during the upgrades of the Calvary Riverina Hospital. Working closely with the team at Fugen Constructions, the whole process from design to installation took six-weeks, a relatively tight turn-around but the team made it happen!
The procedure for installing our propriatary stubb columns is fast, effective and results in little damage to roof sheets. Our engineer-certified and strong stub column design means traditional stub column methods could be considered antiquated.
Spanning over 15m and supported by nine stub columns, the installation took two days meeting the deadline so our HVAC colleagues could install their units.